Chiller Service and Maintenance Agreements
Scheduled maintenance, service priority, consumables and spare parts coverage tailored to equipment operating hours and process criticality.
A chiller service and maintenance agreement (planned maintenance agreement) defines the maintenance schedule, inspection scope, service priority and spare parts planning for industrial cooling equipment. Carnot develops traceable maintenance programmes for all brands throughout Türkiye, based on equipment model, operating hours, process criticality and maintenance history.
What does the maintenance agreement cover?
- Inspections of compressors, refrigerant circuits, electrical panels, pumps, heat exchangers, sensors and automation.
- Scheduled visits, minor and major maintenance planning, statutory leak checks, service reports and critical spare parts tracking.
Inspections review operating values and alarm history, condenser and evaporator condition, water circulation and safety functions. Cleaning and consumable replacement are planned according to actual equipment needs. Rather than replacing every part at every visit, work follows manufacturer recommendations, measurements and inspection findings.
How is the maintenance plan developed?
Equipment inventory and previous service records are reviewed to determine visit frequency and agreement level. The contract clearly defines the included scope of labour, consumables, spare parts, out-of-hours work and breakdown response.
Periodic inspection, preventive maintenance and comprehensive maintenance options are assessed against the facility’s needs. Minor and major maintenance requirements depend on compressor type, operating hours and equipment condition. Included work and additional interventions requiring a separate quotation are defined from the outset.
What is provided after maintenance?
Completed work, measured operating values, findings and recommended actions are documented in a service report. This enables maintenance history tracking, assessment of recurring issues, and planning of future maintenance and parts requirements.
Reports are compared at subsequent visits to track changes in temperatures, pressures and electrical values. A spare parts list is prepared for process-critical components with long lead times. Maintenance is managed as a planned, traceable technical process alongside breakdown response.
Technical Questions About Planned Maintenance Agreements
Let's engineer solutions tailored to your needs
By analyzing your process and operational data against engineering criteria, we determine capacity, system configuration, and implementation details. Let's turn your technical requirements into the right equipment selection and an actionable system design.
